Requires
Flash Player 9

Version Test
Download Flash

RW newsbytes
Reference Room

Broadcast Law Review
Tech Tips
Guy Wire
IBOC DAB
Product Evaluation
RW Special Report

Skip Pizzi/The Big Picture
Wire for Sound
Workbench
IT Management
Roots of Radio
Spotlight on RF Safety
Radio Road Warrior
Green Radio
Certification Corner
Classifieds

Subscribing to RW
Customer Service


The Leslie Report


Cool Stuff Awards Radio World Announces 2008
“Cool Stuff” Award Recipients


Excellence in Engineering Award

Subscribe to Email Newsletters


Click on the widget below to view the last issue of
Radio World Engineering Extra


Requires
Flash Player 9

Version Test
Download Flash




:: view all articles in:
The Reference Room :: Workbench

What’s Inside Box #1?
 
3.26.2008    
John Bisset has worked as a chief engineer and contract engineer for four decades. He is the northeast regional sales manager for Broadcast Electronics and in 2007 received the SBE’s Educator of the Year Award. Reach him at (571) 217-9386 or jbisset@bdcast.com. Faxed submissions can be sent to (603) 472-4944. Submissions for this column are encouraged and qualify for SBE recertification credit.


Tim White, market engineer for the Clear Channel cluster in Sarasota/Bradenton, Fla., writes about a transmitter that had a nasty habit of blowing a power supply module every time there was a bump in the AC power.

Tim was pretty confident it wasn’t the transmitter; and in December, he had 2-1/2 days to investigate as the tower lights, conduit and cable were completely replaced and the site was down.

Fig. 1: Check for corroded lugs behind electric panels.
Tearing into the building’s electrical system, he found a large unfamiliar box in the middle of the AC feed to the transmitters. Labeled the “Kleen Line Filter,” its purpose was to eliminate transient energy.

All three orange lamps glowed on the front of the box. Inside, the fuses never blew, so no one ever took the cover off the device.

Once inside, Tim noticed a loose lug on one of the inductors, shown in Fig. 1. Pretty ugly; but when the lug was removed, the condition of the wires was even uglier, as seen in Fig. 2.

Tim removed the box completely, and the score is several thunderstorms (with lots of power bumps), and the transmitter runs beautifully — like he knew it would. Isn’t it funny how a piece of loose hardware can cause 30 years of heartache?

* * *
Fig. 2: Damaged wires after removing the lug.

The following device is a little pricey unless you have lots of temperatures to monitor, but the company has a broad line of products that may be useful to the broadcast engineer. Check out www.cyberresearch.com.

The company is known for rugged industrial PCs. They have just completed a series of modules that connect directly to temperature detectors and send the results back to your PC via the 2.4 GHz radio band. Gone are the troubles associated with long-distance cabling.

The maximum distance for clear communication depends on building construction and on the number of intervening walls, but 30 meters is typical. Visit the site, you may come up with an interesting application.

* * *

OK, I admit my age is showing. Steve Schuh wrote to remind me that the National Electrical Code does not permit running wire across the top of dropped ceiling panels. I know this, and should have added that the motorized car simply transports the cable — which should be plenum rated.

After the wire is run, Steve clarifies that it needs to be secured above the panels. If there aren’t enough pipes or ducts to keep it up and out of the way, it must be fastened to the structure.

According to the Minnesota inspectors, this means you cannot fasten the wire to the ceiling support wires. You can use support wires as long as you add the support wire and tag it as being installed by the electrical installer as a support wire.

Steve points out that there are other interesting codes as well. One example is that you are not allowed to tie your cable to the outside of electrical conduit unless it is a conduit provided for communications wiring and not power.

Another requirement is that any communication cable must be “listed.” Yet another requirement is to remove any abandoned cable. This means that if cable is installed that is not in use, it must be tagged on each end designating it as a “spare” for future use, or it must be removed.

I think readers are beginning to see why electrician’s rates are so high! That NEC code book is full of amazing, and hard-to-interpret, language.

Fig. 3: Simple hardware prevents flying projectiles
In Minnesota, Steve is required to have a technology contractor license in order to install wiring as a contract engineer. To get the contractor license, he must have at least one full-time licensed Power Limited Technician, and he or she must be on the job site and can supervise no more that two additional installers.

In addition, Steve is now required to take 16 hours of code training every two years to renew his license. In Minnesota, the licensing agency is the same agency that licenses and regulates the electrical contractors.

It’s apparent the codes are catching up with us in the radio business, and Steve thinks that is a good thing. Years ago when Steve and I started in this business, it wasn’t unusual for me to find lamp cord carrying 115 volt AC run around buildings for warning lights and other control uses — even Belden 8451!

* * *
Fig. 4: The new bolt and nut cap keeps everything secure on this LPB Mike Boom.

John Sims of RF Specialties of Missouri sends in this tip from his good customers at Entercom Kansas City.

They have had a problem with a spring mounting stud on the LPB Silent Boom mic arm coming loose. When this happens, the stud becomes a projectile flying across the room — in the general direction of the talent!

Assistant CE Kirk Chestnut and his crew came up with a solution to the problem, pictured in Fig. 3, using common hardware store parts. An 8-32 thumb nut and pan head machine screw now securely hold the springs, as seen in Fig. 4.

If this assembly still comes loose, I imagine you could use those locking nuts, with the plastic inserts, too.

Visit the RF Specialties Web site at www.rfspec.com, where you’ll also find some useful free engineering software.


Sponsored Links
RF Central - Total RF solutions manufacturer (TV broadcast): Full-Service 2GHz Relocation, COFDM, HDTV ENG components, complete links.
Nucomm delivers industry-leading microwave solutions for high-data-rate HD and IP File transport applications from portable ENG/OB to rack-mounted fixed link systems. Click here!
Transradio: DRM, AM, VHF/FM - We make the transmitters. Visit us now at www.transradio.de for more information.
Harris Corporation's Broadcast Communications Division designs products that streamline workflow of content production, processing, transmission, management, storage, test and measurement and broadcast graphics. Click here!
Norterra Technologies offers Bel Digital Audio (Delays, Shufflers, Confidence Monitors, Profanity Delays), Alpermann+Velte products (Timecode, Time Solutions, Clocks), and Esser Test Charts (Test/chip charts, illuminators).


advertisement

Adjustable PC Furniture
Adjustable Computer Furniture! Free Shipping! Lifetime Warranty!

Krohn-Hite Corporation: Company Information
Offers a full line of calibrator products including AC and DC calibrators, simulators, secondary standards, low noise power sources and more.




 
Radio World CoolCasts

Take a virtual booth tour of the products that won the 2008 Radio World "Cool Stuff" Award.
Radio World’s 2008 Source Book & Directory... ...is now available in a special digital edition. In response to many reader requests, our handy annual resource is now online for free. (A 12 MEG PDF)
back   Home | Subscribe | About NewBay Media | Contact Us